University Gym Construction
https://collections.galtmuseum.com/link/descriptions99538
- Material Type
- Photograph
- Date Range
- Mar. 14, 1972
- Description Level
- Item
- Accession No.
- 1991107620285
- Physical Description
- Black and white negative
- Scope and Content
- The gymnasium building (now split up into PE and the Student's Union) under construction at the University of Lethbridge. The building's unusual roof required 57 windless days to be completed - a difficult feat in Lethbridge!
- Material Type
- Photograph
- Date Range
- Mar. 14, 1972
- Description Level
- Item
- Creator
- The Lethbridge Herald
- Physical Description
- Black and white negative
- Physical Condition
- Excellent
- Scope and Content
- The gymnasium building (now split up into PE and the Student's Union) under construction at the University of Lethbridge. The building's unusual roof required 57 windless days to be completed - a difficult feat in Lethbridge!
- Access Restrictions
- Public Access
- Accession No.
- 1991107620285
- Collection
- Archive
Images
{{ server.message }}