Skip header and navigation
Galt Museum and Archives Collections
  • Search
  • Help
  • Selections 0
Print
P1991107618245 thumbnail
Toggle Detail View

Nursing Home Construction

https://collections.galtmuseum.com/link/descriptions95094
Material Type
Photograph
Date Range
Aug. 16, 1971
Description Level
Item
Accession No.
1991107618245
Physical Description
Black and white negative
Scope and Content
Southland Nursing Home on Lethbridge’s north side, which was under construction. The 150 bed home was under the administration of the joint Municipal and Auxiliary hospital and Southland board. Work started in April following much controversy as to the location. Occupancy was expected to begin in J…
More detail
1 image
Material Type
Photograph
Date Range
Aug. 16, 1971
Description Level
Item
Creator
The Lethbridge Herald
Physical Description
Black and white negative
Physical Condition
Excellent
Scope and Content
Southland Nursing Home on Lethbridge’s north side, which was under construction. The 150 bed home was under the administration of the joint Municipal and Auxiliary hospital and Southland board. Work started in April following much controversy as to the location. Occupancy was expected to begin in January, 1972.
Access Restrictions
Public Access
Accession No.
1991107618245
Collection
Archive
Images
P1991107618245 thumbnail
Less detail
  • Share
    Facebook Facebook Twitter Twitter LinkedIn LinkedIn Pinterest Pinterest
  • Feedback
  • More like this
  • Permalink
  • Home
  • Search
  • Help

Galt Museum and Archives
502 1 Street South
Lethbridge, AB

Phone: 403.320.3954
info@galtmuseum.com

© 2025 Galt Museum and Archives