Crane Positioning
https://collections.galtmuseum.com/link/descriptions94857
- Material Type
- Photograph
- Date Range
- July 27, 1971
- Description Level
- Item
- Accession No.
- 19911076178018
- Physical Description
- Black and white negative
- Scope and Content
- Construction of a $28,000 addition was progressing at the Pentecostal Tabernacle at 520 7th St. South. Erection of the pre-cast concrete shell neared completion and interior work was to begin within a few weeks. Construction of the addition at the front of the church began in May.
- Material Type
- Photograph
- Date Range
- July 27, 1971
- Description Level
- Item
- Creator
- The Lethbridge Herald
- Physical Description
- Black and white negative
- Physical Condition
- Excellent
- Scope and Content
- Construction of a $28,000 addition was progressing at the Pentecostal Tabernacle at 520 7th St. South. Erection of the pre-cast concrete shell neared completion and interior work was to begin within a few weeks. Construction of the addition at the front of the church began in May.
- Access Restrictions
- Public Access
- Accession No.
- 19911076178018
- Collection
- Archive
Images
{{ server.message }}