Skip header and navigation
Galt Museum and Archives Collections
  • Search
  • Help
  • Selections 0
Print
P1991107618018 thumbnail
Toggle Detail View

Crane Positioning

https://collections.galtmuseum.com/link/descriptions94857
Material Type
Photograph
Date Range
July 27, 1971
Description Level
Item
Accession No.
19911076178018
Physical Description
Black and white negative
Scope and Content
Construction of a $28,000 addition was progressing at the Pentecostal Tabernacle at 520 7th St. South. Erection of the pre-cast concrete shell neared completion and interior work was to begin within a few weeks. Construction of the addition at the front of the church began in May.
More detail
1 image
Material Type
Photograph
Date Range
July 27, 1971
Description Level
Item
Creator
The Lethbridge Herald
Physical Description
Black and white negative
Physical Condition
Excellent
Scope and Content
Construction of a $28,000 addition was progressing at the Pentecostal Tabernacle at 520 7th St. South. Erection of the pre-cast concrete shell neared completion and interior work was to begin within a few weeks. Construction of the addition at the front of the church began in May.
Access Restrictions
Public Access
Accession No.
19911076178018
Collection
Archive
Images
P1991107618018 thumbnail
Less detail
  • Share
    Facebook Facebook Twitter Twitter LinkedIn LinkedIn Pinterest Pinterest
  • Feedback
  • More like this
  • Permalink
  • Home
  • Search
  • Help

Galt Museum and Archives
502 1 Street South
Lethbridge, AB

Phone: 403.320.3954
info@galtmuseum.com

© 2025 Galt Museum and Archives