Skip header and navigation
Galt Museum and Archives Collections
  • Search
  • Help
  • Selections 0
Print
P1991107616399 thumbnail
Toggle Detail View

Bridge Repairs

https://collections.galtmuseum.com/link/descriptions91099
Material Type
Photograph
Date Range
March 24, 1971
Description Level
Item
Accession No.
1991107616399
Physical Description
Black and white negative
Scope and Content
Repairs to the bridge over Highway 3 over the Oldman River west of Lethbridge were completed in March. Ted Lawrence, city engineering director, said only the painting of the new section remained to be done. The repairs cost just over $2,000. The bridge was damage in the fall of 1970 when a truck i…
More detail
1 image
Material Type
Photograph
Date Range
March 24, 1971
Description Level
Item
Creator
The Lethbridge Herald
Physical Description
Black and white negative
Physical Condition
Excellent
Scope and Content
Repairs to the bridge over Highway 3 over the Oldman River west of Lethbridge were completed in March. Ted Lawrence, city engineering director, said only the painting of the new section remained to be done. The repairs cost just over $2,000. The bridge was damage in the fall of 1970 when a truck involved in an accident ran into the railing.
Access Restrictions
Public Access
Accession No.
1991107616399
Collection
Archive
Images
P1991107616399 thumbnail
Less detail
  • Share
    Facebook Facebook Twitter Twitter LinkedIn LinkedIn Pinterest Pinterest
  • Feedback
  • More like this
  • Permalink
  • Home
  • Search
  • Help

Galt Museum and Archives
502 1 Street South
Lethbridge, AB

Phone: 403.320.3954
info@galtmuseum.com

© 2025 Galt Museum and Archives