Construction Of The traveller On First Stage Of Steel Work
https://collections.galtmuseum.com/link/descriptions8527
- Material Type
- Photograph
- Date Range
- 1908
- Description Level
- Item
- Accession No.
- 19760234029
- Physical Description
- Copy 1 original postcard. Copy 2 Black and white photograph Negative available
- Scope and Content
- The construction of the traveller on the first stages of the steel work.
- Material Type
- Photograph
- Date Range
- 1908
- Description Level
- Item
- Physical Description
- Copy 1 original postcard. Copy 2 Black and white photograph Negative available
- Physical Condition
- Excellent
- History Biographical
- The first three spans of the bridge, as seen here, were laid in place by a small erector, then the "travelling erector" was built on them. The erector took a month to build and cost $100,000. The wooden scaffolding visible at the start of the bridge was left in place and later filled in with soil and ash. It is supposedly still in place today.
- Acquisition Source
- anonymous
- Custodial History
- 1976-08
- P Marshall
- Scope and Content
- The construction of the traveller on the first stages of the steel work.
- Access Restrictions
- Public Access
- Accession No.
- 19760234029
- Collection
- Archive