Skip header and navigation
Galt Museum and Archives Collections
  • Search
  • Help
  • Selections 0
Print
P1991107610373 thumbnail
Toggle Detail View

University of Lethbridge Construction

https://collections.galtmuseum.com/link/descriptions80128
Material Type
Photograph
Date Range
3 November 1969
Description Level
Item
Accession No.
1991107610373
Physical Description
Black and white negative
Scope and Content
Photograph of the first work being done for the new University of Lethbridge, west side campus which started in the fall of 1969 following the letting of contracts for site grading and installation of storm sewers. Earth was moved from several coulee banks in preparation for construction and laying…
More detail
1 image
Material Type
Photograph
Date Range
3 November 1969
Description Level
Item
Creator
The Lethbridge Herald
Physical Description
Black and white negative
Physical Condition
Excellent
Scope and Content
Photograph of the first work being done for the new University of Lethbridge, west side campus which started in the fall of 1969 following the letting of contracts for site grading and installation of storm sewers. Earth was moved from several coulee banks in preparation for construction and laying of a network of pipes to catch run off water at the top of the coulees and carry it to the Oldman River below. Much of the work could be seen from the city, particularly from along Scenic Drive. Contracts for initial construction and preparation of the building site were to be let in December. The campus was expected to open its doors in September, 1971 to more than 2,200 students.
Access Restrictions
Public Access
Accession No.
1991107610373
Collection
Archive
Images
P1991107610373 thumbnail
Less detail
  • Share
    Facebook Facebook Twitter Twitter LinkedIn LinkedIn Pinterest Pinterest
  • Feedback
  • More like this
  • Permalink
  • Home
  • Search
  • Help

Galt Museum and Archives
502 1 Street South
Lethbridge, AB

Phone: 403.320.3954
info@galtmuseum.com

© 2025 Galt Museum and Archives