Skip header and navigation
Galt Museum and Archives Collections
  • Search
  • Help
  • Selections 0
Print
P20111003 thumbnail
Toggle Detail View

Construction of the Foremost-Burdett gas pipeline

https://collections.galtmuseum.com/link/descriptions79586
Material Type
Photograph
Date Range
1924
Description Level
Item
Accession No.
20111003
Physical Description
1 black and white photograph
More detail
1 image
Material Type
Photograph
Date Range
1924
Description Level
Item
Physical Description
1 black and white photograph
Physical Condition
Very Good
History Biographical
Workers are fitting steal gas pipes during the construction of the 32-mile pipeline from Foremost to Burdett. The project was undertaken by the Canadian Western Natural Gas, Light, Heat and Power Co. to connect the area with the transmission line to Calgary. The labourers joined the pipe sections with Dresser couplings, coated the joints with hot enamel, a tar like substance, and lowered the pipe into the ground. It was back breaking work. Most of the pipeline was competed in record time between May and September of 1924, under the supervision of James J. Morrison, construction superintendent. For more information and images, see James Jacob Morrison fonds
Language
English
Acquisition Source
Morrison, Chris
Custodial History
The photograph originally belonged to the donor's grandfather-in-law, Mr. James J. Morrison, who supervised the project.
Access Restrictions
Public Access
Accession No.
20111003
Collection
Archive
Images
P20111003 thumbnail
Less detail
  • Share
    Facebook Facebook Twitter Twitter LinkedIn LinkedIn Pinterest Pinterest
  • Feedback
  • More like this
  • Permalink
  • Home
  • Search
  • Help

Galt Museum and Archives
502 1 Street South
Lethbridge, AB

Phone: 403.320.3954
info@galtmuseum.com

© 2026 Galt Museum and Archives