Construction of the Foremost-Burdett gas pipeline
https://collections.galtmuseum.com/link/descriptions79586
- Material Type
- Photograph
- Date Range
- 1924
- Description Level
- Item
- Accession No.
- 20111003
- Physical Description
- 1 black and white photograph
- Material Type
- Photograph
- Date Range
- 1924
- Description Level
- Item
- Physical Description
- 1 black and white photograph
- Physical Condition
- Very Good
- History Biographical
- Workers are fitting steal gas pipes during the construction of the 32-mile pipeline from Foremost to Burdett. The project was undertaken by the Canadian Western Natural Gas, Light, Heat and Power Co. to connect the area with the transmission line to Calgary. The labourers joined the pipe sections with Dresser couplings, coated the joints with hot enamel, a tar like substance, and lowered the pipe into the ground. It was back breaking work. Most of the pipeline was competed in record time between May and September of 1924, under the supervision of James J. Morrison, construction superintendent. For more information and images, see James Jacob Morrison fonds
- Language
- English
- Acquisition Source
- Morrison, Chris
- Custodial History
- The photograph originally belonged to the donor's grandfather-in-law, Mr. James J. Morrison, who supervised the project.
- Access Restrictions
- Public Access
- Accession No.
- 20111003
- Collection
- Archive