Skip header and navigation
Galt Museum and Archives Collections
  • Search
  • Help
  • Selections 0
Print
P19981022007 thumbnail
Toggle Detail View

The Bow Island To Calgary Natural Gas

https://collections.galtmuseum.com/link/descriptions10768
Material Type
Photograph
Date Range
1912
Description Level
Item
Accession No.
19981022007
Physical Description
12.7 x 17.8 cm Black and white copy photograph
Scope and Content
View of the steam ditch digging machine used in the construction of the Bow Island to Calgary Natural Gas pipeline.
More detail
1 image
Material Type
Photograph
Date Range
1912
Description Level
Item
Physical Description
12.7 x 17.8 cm Black and white copy photograph
Physical Condition
Excellent
History Biographical
Using mostly manpower and horse-drawn vehicles, construction of the 170 mile transmission line from the bow island field to Lethbridge and then to calgary took just 86 days". Information unattributed.
Acquisition Source
Enns Lyn
Scope and Content
View of the steam ditch digging machine used in the construction of the Bow Island to Calgary Natural Gas pipeline.
Access Restrictions
Public Access
Accession No.
19981022007
Collection
Archive
Images
P19981022007 thumbnail
Less detail
  • Share
    Facebook Facebook Twitter Twitter LinkedIn LinkedIn Pinterest Pinterest
  • Feedback
  • More like this
  • Permalink
  • Home
  • Search
  • Help

Galt Museum and Archives
502 1 Street South
Lethbridge, AB

Phone: 403.320.3954
info@galtmuseum.com

© 2025 Galt Museum and Archives