The Bow Island To Calgary Natural Gas
https://collections.galtmuseum.com/link/descriptions10767
- Material Type
- Photograph
- Date Range
- 1912
- Description Level
- Item
- Accession No.
- 19981022006
- Physical Description
- 12.7 x 17.8 cm Black and white copy photograph
- Scope and Content
- Steam tractor pulling trailers full of pipe for the laying of the Bow Island to Calgary Natural Gas pipeline.
- Material Type
- Photograph
- Date Range
- 1912
- Description Level
- Item
- Physical Description
- 12.7 x 17.8 cm Black and white copy photograph
- Physical Condition
- Excellent
- History Biographical
- Using mostly manpower and horse-drawn vehicles, construction of the 170 mile transmission line from the Bow Island field to Lethbridge and then to Calgary took just 86 days". Information unattributed.
- Acquisition Source
- Enns Lyn
- Scope and Content
- Steam tractor pulling trailers full of pipe for the laying of the Bow Island to Calgary Natural Gas pipeline.
- Access Restrictions
- Public Access
- Accession No.
- 19981022006
- Collection
- Archive
Images
{{ server.message }}